This project, under NRC (Northern Refinery Company) contracts, involves the rehabilitation of ten (10)
medium-voltage substations, as well as one main substation rated from 33 kV to 11 kV, stepping down
further to 3.3 kV and 0.4 kV. The remaining stations are 3.3 kV to 0.4 kV. Our key focus is to supply and
install new switchgear and transformers that comply with the refinery’s technical specifications while
ensuring minimal operational interruptions at Baiji Refinery.
Fitting GIS switchgear into the original substation footprint requires precise civil modifications and accurate dimension checks.
Old control and protection drawings must be updated and aligned with the new designs, which involves extensive engineering reviews.